Florida’s Trusted Low-Voltage Infrastructure Experts

We plan and install low-voltage cabling and security systems across Florida’s commercial projects – with clear scope, steady coordination,
and timelines you can rely on.

Trusted By

When the stakes are high and the timeline is fixed – these are the organisations that trust ASE to deliver.

Who We Are

Behind every ASE project is a team of BICSI-certified designers and experienced project managers who take infrastructure seriously. We’ve worked alongside South Florida’s most demanding clients for over 40 years and always delivered what we promised.

Experience

40+

Years in the Industry

Technicians

50+

Certified Technicians & Project Managers

Industries we served

Universities, Hospitals, Municipalities & More

Certifications

BICSI

Certified RCDDs On Staff

When ASE is on your project, the groundwork has already been laid:

Before committing to any project, we confirm manpower, materials, and realistic timelines. Not because we have to – because that’s the only way we work.

What We Do - And What It Means for Your Project.

Structured Cabling

Poor cabling creates problems that outlast the project by years.

We design and install copper and fiber systems built for the long haul – so your network never becomes the reason something stops working.

Structured Cabling

Poor cabling creates problems that outlast the project by years.

We design and install copper and fiber systems built for the long haul – so your network never becomes the reason something stops working.

Structured Cabling

Poor cabling creates problems that outlast the project by years.

We design and install copper and fiber systems built for the long haul – so your network never becomes the reason something stops working.

Structured Cabling

Poor cabling creates problems that outlast the project by years.

We design and install copper and fiber systems built for the long haul – so your network never becomes the reason something stops working.

Structured Cabling

Poor cabling creates problems that outlast the project by years.

We design and install copper and fiber systems built for the long haul – so your network never becomes the reason something stops working.

Structured Cabling

Poor cabling creates problems that outlast the project by years.

We design and install copper and fiber systems built for the long haul – so your network never becomes the reason something stops working.

Connected Across the Industry

We collaborate with Florida’s leading contractors, architects, and property developers – and hold strategic alliances with the manufacturers and solution providers who power the work.

Certifications That Back Our Work

Every project we deliver is supported by manufacturer certifications, BICSI-trained designers, and over four decades of verified experience.

12245 SW 132nd Ct
Miami, FL 33186
Phone: (305) 471-0088
Fax: (786) 272-5558

Services

Design

Programming

Audit

Solutions

Structured Cabling

Data Center Cabling

Security, Access Control & CCTV

About Us

Contact Us

Copyright & design by ASE Telecom & Data – 2026

What Our Client Says

1da54cde7095f48d1fbd6eaf3333962f76b98b6b
1904d6ff342c4eee54ade493df9dec03e976bcd7

We’ve brought ASE into multiple projects across campus. They show up prepared, communicate throughout, and the documentation at closeout is always exactly what we need.

Denis Slavska

Director of IT Infrastructure

1da54cde7095f48d1fbd6eaf3333962f76b98b6b
1904d6ff342c4eee54ade493df9dec03e976bcd7

We’ve brought ASE into multiple projects across campus. They show up prepared, communicate throughout, and the documentation at closeout is always exactly what we need.

Denis Slavska

Director of IT Infrastructure

Edit Template

A Process Built Around Zero Surprises

With pre-bid drawing review, manufacturer-specified installs & testing, and RCDD oversight & CAD handover, we have a single accountable process that aligns planning, procurement, installation and close-out – so systems are delivered on schedule and ready for operations.

500+

Projects delivered

98%

On-time completion

24/7

Support coverage

A Process Built Around Zero Surprises

With pre-bid drawing review, manufacturer-specified installs & testing, and RCDD oversight & CAD handover, we have a single accountable process that aligns planning, procurement, installation and close-out – so systems are delivered on schedule and ready for operations.

The 5 Steps

The ASE Method

Our five-step coordination method is designed for fewer RFIs, no surprise change orders, and a digital handover package your IT and facilities teams can use day one.

Talk To Us
01

Discovery Call

Drawings and floor plans do not show the full picture. We clarify project scope, define system requirements, identify procurement ownership, flag high-risk conditions, and set a timeline to avoid ambiguity later.

Which means the proposal you receive is built on verified details and with zero assumptions.

02

Floor Plan Review & Site Survey

Under RCDD oversight, our team walks the site to confirm pathways, rack locations, conduit capacity, and equipment placement to validate actual site conditions before the design moves forward.

Which means conflicts between the drawings and the site are resolved before installation begins.

03

Proposal & Project Planning

We translate validated plans into a structured proposal with clear scope, a Bill of Materials with manufacturer-approved components, and a defined execution sequencing.

Which means there are no surprises in scope, schedule, or cost once the work begins.

04

Installation

Before we arrive, the crew is confirmed, the materials are ready, and the schedule is locked. On site, we follow the plan and coordinate directly with your team.

Which means installation starts with the right crew, the right materials, and a clear plan.

05

Certification & Close-Out

Installation is carried out as per TIA standards and vendor specs, followed by channel and component testing and structured digital handover documentation.

Which means the infrastructure can be traced, verified, and worked on with confidence later.

The ASE Method
01

Discovery Call

Drawings and floor plans do not show the full picture. We clarify project scope, define system requirements, identify procurement ownership, flag high-risk conditions, and set a timeline to avoid ambiguity later.

Which means the proposal you receive is built on verified details and with zero assumptions.

02

Floor Plan Review & Site Survey

Under RCDD oversight, our team walks the site to confirm pathways, rack locations, conduit capacity, and equipment placement to validate actual site conditions before the design moves forward.

Which means conflicts between the drawings and the site are resolved before installation begins.

03

Proposal & Project Planning

We translate validated plans into a structured proposal with clear scope, a Bill of Materials with manufacturer-approved components, and a defined execution sequencing.

Which means there are no surprises in scope, schedule, or cost once the work begins.

04

Installation

Before we arrive, the crew is confirmed, the materials are ready, and the schedule is locked. On site, we follow the plan and coordinate directly with your team.

Which means installation starts with the right crew, the right materials, and a clear plan.

05

Certification & Close-Out

Installation is carried out as per TIA standards and vendor specs, followed by channel and component testing and structured digital handover documentation.

Which means the infrastructure can be traced, verified, and worked on with confidence later.

Where Most Processes Fall Apart

01

Frame (9)

In scopes that leave gaps between trades.

02

Group 1171277598 (1)

In procurement decisions made without full system visibility.

03

Group 1171277598 (2)

In changes left until site mobilization, where they cost the most.

At ASE, we’ve spent decades perfecting a process to eliminate these gaps before they reach the site. What gets planned is what actually gets delivered.

Project Standards We Never Compromise

BICSI-Certified Technicians On The Job

Every install is executed by manufacturer-trained and BICSI-certified technicians alongside installers following TIA & BICSI standards and vendor installation guides.

Single-Point Project Coordination

One accountable project coordinator aligns drawing review, procurement, trade sequencing and site execution so scope gaps and finger-pointing never happen.

Tested System & Digital Close-Out

With RCDD-certified professionals oversight against TIA standards, we deliver as-built CAD drawings and system records as part of a structured digital close-out package.

Trusted by Organizations That Can't Afford to Get It Wrong

In facilities where infrastructure underpins clinical care, research, security, and daily operations, the margin for error is zero – and ASE meets that standard, always.

University of Miami – OSP Fiber Optic Cabling

As the University of Miami expanded across multiple campuses, its existing backbone could no longer support growing bandwidth across classrooms, labs, and administrative buildings. A new fiber optic backbone between buildings had to be installed without disrupting live academic networks or campus operations.

THE OUTCOME

We deployed a fully connected campus fiber backbone delivering high-capacity connectivity between core campus systems.

10+

Years Of Partnership

Carnival Cruise Lines – Fiber Optic Cabling

Cruise vessels rely on structured fiber networks for navigation, security, communications, and guest systems. Upgrading the ship’s backbone required installing and terminating fiber optic cabling across multiple decks and technical spaces without disrupting active onboard operations.

THE OUTCOME

We configured a resilient, high-capacity fiber backbone supporting the ship’s critical systems and onboard connectivity.

10+

Years Of Partnership

Our Process, In Practice

Jackson Memorial Hospital

One of South Florida’s largest active healthcare environments. ASE has managed ongoing data infrastructure upgrades across multiple phases with every access window planned in advance, every phase sequenced around live operations, the same dedicated crew on site every time.

University of Miami

Across multiple campuses and building types, ASE has supported the University of Miami through expansions, renovations, and infrastructure upgrades for over a decade. Fiber optic installations, data center work, new cabling schemes with the same team, the same standard, every time.

We only bid on projects we can
deliver

Before we say yes to any project, we verify the crew, confirm material availability, and validate the timeline internally. A commitment from ASE means the groundwork is already done.

We only bid on projects we can deliver.

Before we say yes to any project, we verify the crew, confirm material availability, and validate the timeline internally. A commitment from ASE means the groundwork is already done.

Let's Talk About Your Project.

Whether you’re in early planning or ready to move – tell us about the project and we’ll figure out the right next step together.

Your Business Potential with Our Proven Strategies

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Lorem ipsum dolor sit amet, consectetur adipiscing elit.

Company

About Us

Contact Us

Products

Services

Blog

Features

Analytics

Engagement

Builder

Publisher

Help

Privacy Policy

Terms

Conditions

Product

Lorem ipsum dolor sit amet, consectetur adipiscing elit.
You have been successfully Subscribed! Ops! Something went wrong, please try again.
© 2023 Created with Royal Elementor Addons