Designing the Blueprint Behind Reliable Infrastructure
With ASE, infrastructure doesn’t get figured out during installation.
It gets engineered beforehand – with layouts, pathways, capacities, and documentation that every contractor builds from.
Critical Decisions Made Before Installation
Before installation starts, your project has a complete engineering plan for the infrastructure the building will run on.
Infrastructure Layout Is Defined First
Cable routes, equipment locations, camera coverage, and access points mapped across the facility before any installation begins.
Quantities Are Calculated Before Procurement
Cable quantities, equipment lists, rack components, and pathway capacity calculated during design so procurement begins with accurate requirements.
Installation Teams Build From One Plan
Engineering drawings, and installation standards delivered as a complete construction reference used by every contractor on the project.
The Range That Makes Every Project Manageable
Every facility has different requirements. We assess what yours needs and build accordingly – from a single floor copper rollout to a full campus fiber deployment.
When your in-building network needs to be fast, reliable, and built to last – we specify and install the right copper category for your environment.
ENTRY LEVEL
Cat 5e
UTP / ScTP – Budget-friendly foundation for basic networking needs
Max Speed
1 Gbps
Bandwidth
100 MHz
PoE Support
100 m
Shielding
UTP / ScTP
PoE Support
✓ 802.3af / 802.3at
BEST FOR
Small offices, light internet use, VoIP, basic IP cameras
Most Popular
Cat 6
UTP / FTP – The go-to choice for modern commercial environments
Max Speed
10 Gbps
Bandwidth
250 MHz
Max Distance
100 m (55 m @ 10G)
Shielding
UTP / FTP
PoE Support
✓ 802.3af / 802.3at
BEST FOR
Mid-size offices, HD video conferencing, wireless APs, general enterprise
High Performance
Cat 6A
UTP / FTP – Future-proof infrastructure for demanding environments
Max Speed
10 Gbps
Bandwidth
500 MHz
Max Distance
100 m
Shielding
UTP / FTP (Augmented)
PoE Support
✓ 802.3af/at/bt
BEST FOR
Data centers, hospitals, high-density WiFi, and business-critical networks.
Infrastructure Improvised Today Gets Rebuilt Tomorrow
Poor planning leaves critical decisions to the installation phase, where teams are left figuring things out in real time.

Installation Beginning Without a Plan
When planning happens on site rather than early on, systems are routed around obstacles instead of planned for the facility, creating inefficient layouts and long-term limitations.

Critical Decisions Taken Mid-Installation
Without early infrastructure design, decisions about capacity, equipment placement, and cable pathways move into installation, where choices become limited and adjustments become harder.

Installation Shortcuts Becoming Expensive Fixes
Once installation is completed, changing pathways, equipment locations, or system layouts becomes disruptive and expensive, making it critical to get these decisions right from the start.
What We Verify Before Infrastructure Design Begins
From the first site survey to security system layouts and campus fiber routes, our design team finalizes placements & drawings that every building operation will rely on.
Site surveys and infrastructure assessments that define how systems will be deployed across the facility.
Site Survey & Infrastructure Planning
ScopeCopper and fiber cabling routes, pathway layouts, and termination points designed throughout the building.
Structured Cabling System Design
ScopeRack layouts, power distribution, airflow planning, and capacity design for data centers and network rooms.
Infrastructure Design
ScopePre-Term Infrastructure Design
ScopeFiber Runner System Design
ScopeUnderground conduit routes, duct banks, and outside plant cable paths engineered between buildings.
Conduit & Duct Bank Design
ScopeOutside Plant Cable Route Planning
ScopeAccess control and CCTV systems designed for proper coverage, placement, and recording requirements.
Access Control System Design
ScopeCCTV System Layout & Camera Placement
ScopeEngineering That Holds Up in the Field
Layouts, drawings, and documentation align so installation proceeds without guesswork.
On-site Assessment
Design Grounded in Field Conditions
We develop layouts and routing decisions with real installation conditions in mind, ensuring the work on paper translates cleanly to the work performed on site.
Integrated Design
Drawings Produced In-House
Our drafting team produces all layouts internally, maintaining precision and preventing the coordination issues that often arise with outsourced drawings.
Construction Documentation
Documentation Prepared in Detail
We provide detailed documentation including technical specifications, as-built drawings, and verified test results so you always have an accurate project record.
Trusted by Organizations That Can't Afford to Get It Wrong
In facilities where infrastructure underpins clinical care, research, security, and daily operations, the margin for error is zero – and ASE meets that standard, always.
University of Miami – OSP Fiber Optic Cabling
As the University of Miami expanded across multiple campuses, its existing backbone could no longer support growing bandwidth across classrooms, labs, and administrative buildings. A new fiber optic backbone between buildings had to be installed without disrupting live academic networks or campus operations.
THE OUTCOME
We deployed a fully connected campus fiber backbone delivering high-capacity connectivity between core campus systems.
10+
Years Of Partnership
Carnival Cruise Lines – Fiber Optic Cabling
Cruise vessels rely on structured fiber networks for navigation, security, communications, and guest systems. Upgrading the ship’s backbone required installing and terminating fiber optic cabling across multiple decks and technical spaces without disrupting active onboard operations.
THE OUTCOME
We configured a resilient, high-capacity fiber backbone supporting the ship’s critical systems and onboard connectivity.
10+
Years Of Partnership
Trusted by Organizations That Can't Afford to Get It Wrong
The planning that made installation straightforward, infrastructure reliable, and the final system easier to manage.
Nova Southeastern University - Campus Infrastructure Design
NSU required infrastructure engineering across multiple campuses. ASE surveyed all buildings and produced structured cabling plans, outside plant routing, and security system layouts.
THE OUTCOME
Documentation delivered for everything, including cable schedules, pathway drawings, and camera placement diagrams.
20+
Buildings Covered
Broward Sheriff's Office - Security System Design
ASE engineered access control architecture and CCTV layout documentation across operational and administrative areas including reader placement, controller locations, access hierarchy, and surveillance coverage zones.
The Outcome
Complete system design package delivered before procurement, allowing installation to proceed without redesign.
25+
Security Zones Covered
Explore Related Services
Programming
Infrastructure Audit
Frequently Asked Questions
Here are some common questions about our services to help you understand better.
Let's Talk About Your Project.
Whether you’re in early planning or ready to move – tell us about the project and we’ll figure out the right next step together.